Planned Maintenance - Mechanical and/or Hydraulic Dock Leveler(s)

INSPECTION: Physical condition of leveler(s)
  • All welds
  • Fluid levels & hoses
  • Lip crown
  • Operation of cross traffic legs
  • Wear of all parts
  • Excessive wear of bumpers
  • Cables, chains, clevis pins
  • Operation of all mechanisms
  • Metal fatigue
ADJUSTMENTS: As required within manufacturer’s recommended tolerances to maintain proper operation
  • Ramp counterbalance
  • Ramp control
  • Lip extension & counterbalance
  • Hydraulic valves
  • Recycle switch
LUBRICATION: General housekeeping
  • Clean pit
  • Clean lip hinge
  • Clear rear hinge area
NOTE: Any parts, welding or labor required, not covered by this contract, will be brought to your attention with an estimated cost for such repairs. Minor parts covered under PMP Agreement.